Investigating the Quality of Conflict Management on the Performance of the North Tehran Freeway Project with the Mediating Role of Flexibility

Authors

  • Sadaf Mehdipour Parizad * Gilan Province Construction Engineering Organization, Gilan, Iran.
  • Habibeh Karimi Department of research center, Shiroud Municipality, Mazandaran, Iran. https://orcid.org/0009-0009-8554-7008

https://doi.org/10.48314/jcase.v2i3.66

Abstract

The purpose of this study is to investigate the effect of conflict management quality on the performance of the North Tehran Freeway Project with the mediating role of flexibility. The study population is managers and experts of the North Tehran Freeway Project. Given that the size of the statistical population in this study is 280 people, and according to the Cochran formula, the required sample size is 162 people. In this study, a standard questionnaire was used to collect data. The questionnaires were distributed and collected using a rando maccess method. To analyze the data, structural equation testing with partial least squares was used using SMART-PLS software along with descriptive statistics. The test results at a 95% confidence level showed that the quality of conflict management, with the mediating role of flexibility, has a positive effect on project performance (p<0.05). The quality of conflict management has a positive effect on project performance. The quality of conflict management has a positive impact on flexibility. Flexibility has a positive impact on project performance. Therefore, project managers with the appropriate conflict management style and flexibility can partially reduce the possible consequences of destructive conflict, including increased costs, severe reduction in communication between individuals and groups, resistance to change, increased tension and stress, failure to deliver projects on time, poor performance, and unhealthy business relationships.

Keywords:

Conflict management quality, Project performance, North Tehran Freeway, Flexibility

References

  1. [1] Zhou, Y., Tong, C., & Wang, Y. (2022). Road construction, economic growth, and poverty alleviation in China. Growth and change, 53(3), 1306–1332. https://doi.org/10.1111/grow.12617

  2. [2] Alazemi, M., & Mohiuddin, A. (2019). Conflict management of construction projects-a research. International journal of engineering and advanced technology, 8, 3809–3817. https://doi.org/10.35940/ijeat.F9396.088619

  3. [3] Zhang, L., & Huo, X. (2015). The impact of interpersonal conflict on construction project performance: A moderated mediation study from China. International journal of conflict management, 26(4), 479–498. https://doi.org/10.1108/IJCMA-09-2014-0072

  4. [4] Guangdong, W., Zhao, X., Zuo, J., & Zillante, G. (2017). Effects of contractual flexibility on conflict and project success in megaprojects. International journal of conflict management, 29. https://doi.org/10.1108/IJCMA-06-2017-0051

  5. [5] Hu, Z., Wu, G., Zhao, X., Zuo, J., & Wen, S. (2021). How does the strength of ties influence relationship quality in Chinese megaprojects? The mediating role of contractual flexibility. Baltic journal of management, 16(3), 366–385. https://doi.org/10.1108/BJM-09-2020-0347

  6. [6] Wang, Y., & Zhang, Q. (2024). The impact of entrepreneurial orientation on innovation performance through strategic flexibility in modern project management. The journal of modern project management, 12(1), 166–179. https://journalmodernpm.com/manuscript/index.php/jmpm/article/view/776

  7. [7] Zaman, U., Nawaz, S., Tariq, S., & Humayoun, A. A. (2019). Linking transformational leadership and “multi-dimensions” of project success: Moderating effects of project flexibility and project visibility using PLS-SEM. International journal of managing projects in business, 13(1), 103–127. https://doi.org/10.1108/IJMPB-10-2018-0210

  8. [8] Liu, H., Yan, J. W., & Yang, Q. H. (2015). Engineering philosophy-based reflections on efficient development of shale gas in China. Frontiers of engineering management, 2(2), 108-113.. https://journal.hep.com.cn/fem/EN/10.15302/J-FEM-2015030

  9. [9] Alvarez, C., Gabaldon, A., & Molina, A. (2004). Assessment and simulation of the responsive demand potential in end-user facilities: application to a university customer. IEEE transactions on power systems, 19(2), 1223–1231. https://doi.org/10.1109/TPWRS.2004.825878

  10. [10] Lin, Y. H., Guo, Y., Kim, C. J., Chen, P. H., & Qian, M. (2020). The impact of relational governance on the adaptability of international contractors: a comparative study between China and Korea. Engineering, construction and architectural management, 27(10), 3235–3259. https://doi.org/10.1108/ECAM-12-2019-0719

  11. [11] Choi, S. (2017). Managing Flexible work arrangements in government: Testing the effects of institutional and managerial support. Public personnel management, 47(1), 26–50. https://doi.org/10.1177/0091026017738540

  12. [12] Wang, S., Wang, X., & Zhang, J. (2021). A review of flexible processes and operations. Production and operations management, 30(6), 1804–1824. https://doi.org/10.1111/poms.13101

  13. [13] Frydlinger, D., Hart, O., & Vitasek, K. (2019). A new approach to contracts. Harvard business review, 97(5), 116–126. https://mediation.com.sg/wp-content/uploads/2024/01/7-Harvard-BR-A-New-Approach-to-Contracts-2019.pdf

Published

2025-09-27

How to Cite

Mehdipour Parizad, S., & Karimi, H. (2025). Investigating the Quality of Conflict Management on the Performance of the North Tehran Freeway Project with the Mediating Role of Flexibility. Journal of Civil Aspects and Structural Engineering, 2(3), 228-233. https://doi.org/10.48314/jcase.v2i3.66

Similar Articles